Installation Time
(approx) 6 Hours
Difficulty Level:
Mechanical expertise or professional installation required.
FREE 1 to 3-Day Delivery on Orders $119+ Details
$2,363.60 pair
Saved - View your saved items
We're sorry. We couldn't save this product at this time.
Features, Description, Q&A, Specs & Installation
Feel the Surge of Power. Say goodbye to restrictions and hello to unbridled performance. These Stainless Works 1-7/8-Inch Catted Long Tube Headers are meticulously engineered to optimize exhaust flow, reducing backpressure and allowing your engine to breathe freely. A substantial increase in horsepower and torque that you'll feel with every press of the accelerator. Experience exhilarating acceleration, improved throttle response, and the confidence to dominate any road or track.
A Soundtrack to Match the Performance. The Stainless Works 1-7/8-Inch Catted Long Tube Headers don't just boost performance; they enhance the auditory experience as well. As your Trackhawk roars to life, you'll be greeted by a deep, throaty growl that announces its presence with authority. It's a symphony of power that perfectly complements the Trackhawk's aggressive character and leaves a lasting impression wherever you go.
Emissions Compliance. These Stainless Works 1-7/8-Inch Catted Long Tube Headers are not only designed for performance but also for responsibility. The integrated catalytic converters ensure your Trackhawk remains compliant with emissions regulations, allowing you to enjoy the power gains without compromising environmental responsibility.
Installation. Putting these Stainless Works 1-7/8-Inch Catted Long Tube Headers on your Jeep Grand Cherokee WK2 Trackhawk takes a day to install.
Warranty There is a limited lifetime warranty on this product.
Application. These Stainless Works 1-7/8-Inch Catted Long Tube Headers; Factory Connect are designed to fit 2018-2021 Jeep Grand Cherokee WK2 Trackhawk models.
Fitment:
DetailsStainless Works JEEP1862HCAT
CA Residents: WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Installation Info
Installation Time
(approx) 6 Hours
Difficulty Level:
Mechanical expertise or professional installation required.
What's in the Box