Talk to a Wrangler Sales Tech
1-877-870-8556
M-F 8:30A-11P, Sat-Sun 8:30A-9P
Logo Image

Long-Lead Mini Fuse Bypass Switch (1998 Jeep Wrangler TJ)Find parts that fit my vehicle

Item J154427
$0.00
Want $10? Write one of the first 5 reviews
Our Price

$72.95

Ship to: Enter Zip
Please enter a valid US or CA postal code
We're sorry, zip can't be updated at this time.

Will this fit your Vehicle?

Select a different vehicle Help?
Update or Change Vehicle
    Create a list
    Add to New List

    Saved - View your saved items

    We're sorry. We couldn't save this product at this time.

    or use

      Product Information

      Features, Description, Q&A

      Features

      • Single Fuse Bypass Switch
      • Avoid Replacing Fuses When Flat Towing
      • Integrates With CURT RV Harness (Which is Sold Separately)
      • No Fuse Included
      • 20 Amp Max
      • 1-Year Limited Warranty
      • Fits All 1998 Jeep Wrangler TJ Models

      Description

      No More Fuse Replacements. Having to remove and replace fuses when you’re flat towing is an annoyance that you shouldn’t have to deal with. Enter the Jeep Wrangler Long-Lead Mini Fuse Bypass Switch. This product allows you to avoid the time-consuming removal and replacement of fuses, allowing you to bypass the fuse and get going again in no time at all.

      Product Specifications. The Jeep Wrangler Long-Lead Mini Fuse Bypass Switch has a 20-Amp maximum capacity and does not come with a fuse installed. Made by CURT, the switch also integrates with the company’s RV harness. However, you will need to buy the harness separately.

      Straightforward Installation. The Jeep Wrangler Long-Lead Mini Fuse Bypass Switch comes with a set of instructions that guide you through the eight steps for installation. You will need some tools to install the switch, including a drill, a 3/4-inch drill bit, and another drill bit that is less than 3/4 inches. Some minor wiring and vehicle modification are required, though it is all fairly straightforward.

      1-Year Limited Warranty. The switch comes with a 1-year limited warranty that protects you against issues related to manufacturing and material defects. This warranty has exclusions so read it in full before making your purchase.

      Application. The Jeep Wrangler Long-Lead Mini Fuse Bypass Switch is designed to fit the 1998 Jeep Wrangler TJ. CURT offers other versions of the switch with vehicle-specific specifications if you would like the same product for a different vehicle.

      Installation Difficulty. With some minor vehicle modifying and wiring work required, installation is suitable for people with an intermediate skill level. Installation will likely take between 1-2 hours.

      CA Residents: WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov

      Questions & Answers

      No questions about this product yet. Ask the First Question